JaCoW Logo

Reference Search

Author: M. Wiseman


References



Reference
M. A. Drury et al., “Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MOPB030, pp. 237-239.
M. A. Drury et al., “Overview of SNS Cryomodule Performance”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper RPPE060, pp. 3496-3498.
M. A. Drury et al., “CEBAF Upgrade: Cryomodule Performance and Lessons Learned”, in Proc. 16th Int. Conf. RF Superconductivity (SRF'13), Paris, France, Sep. 2013, paper THIOB01, pp. 836-843.
L. Merminga et al., “Beam Physics for the 12 GeV CEBAF Upgrade Project”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper TPPP016, pp. 1482-1484.
K. Macha et al., “Alignment of CEBAF Cryomodules”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 2929-2932.
K. M. Wilson et al., “Managing Procurements in the Time of Covid-19: SNS-PPU as a Case Study”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 863.
K. Elliott et al., “First FRIB =0.041 Production Coldmass Build”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 541-543.
J. Wei et al., “The FRIB Superconducting Linac - Status and Plans”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. XX-XX.
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, presented at the 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, unpublished.


Back to the list