JaCoW Logo

Reference Search

Author: C. Bertone


References



Reference
M. Vretenar et al., “The Linac4 Project at CERN”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper TUOAA03, pp. 900-902.
S. S. Gilardoni et al., “The Proposed CERN Proton-Synchrotron Upgrade Program”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper WEPS018, pp. 2520-2522.
K. Hanke et al., “Study of an Energy Upgrade of the CERN PS Booster”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper WEPS020, pp. 2526-2528.
K. Hanke et al., “Status of the Upgrade of the CERN PS Booster”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPWO078, pp. 3939-3941.
S. S. Gilardoni et al., “The PS Upgrade Programme: Recent Advances”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPEA042, pp. 2594-2596.
K. Hanke et al., “Status and Plans for the Upgrade of the CERN PS Booster”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3905-3907.
M. A. Fraser et al., “SPS Slow Extraction Losses and Activation: Challenges and Possibilities for Improvement”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 611-614.
K. Foraz et al., “Collimator Integration and Installation Example of One Object to be Installed in the LHC”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPP009, pp. 2542-2544.
M. Vretenar et al., “Progress in the Construction of Linac4 at CERN”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPB010, pp. 864-866.
K. Kershaw et al., “Remotely Operated Train for Inspection and Measurement in CERN's LHC Tunnel”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE6RFP047, pp. 2902-2904.


Back to the list