|
M. Vretenar et al., “The Linac4 Project at CERN”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper TUOAA03, pp. 900-902. |
|
K. Foraz et al., “Reliability and Intervention Management for the LHC”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper MOPPC012, pp. 148-150. |
|
K. Foraz et al., “LHC Long Shutdown: A Parenthesis for a Challenge”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper TUPFI013, pp. 1355-1357. |
|
M. Vretenar et al., “Status and Plans for Linac4 Installation and Commissioning”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 3332-3334. |
|
K. Foraz et al., “LS1 ``First Long Shutdown of LHC and its Injector Chains''”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 1010-1012. |
|
M. Meddahi et al., “Status of the LHC Injectors Upgrade (LIU) Project at CERN”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3915-3918. |
|
K. Foraz et al., “Lessons Learned From the First Long Shutdown of the Lhc and Its Injector Chain”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 2050-2052. |
|
E. N. Shaposhnikova et al., “LHC Injectors Upgrade (LIU) Project at CERN”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 992-995. |
|
M. Barberan Marin et al., “Integration, Configuration and Coordination: from Project to Reality, at CERN”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 1407-1409. |
|
S. Chemli et al., “New Coordination Tools to Prepare Programmed Stops in the LHC and its Injectors”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 200-203. |