|
J. Feikes et al., “First Commissioning Results of the Metrology Light Source”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPMN015, pp. 947-949. |
|
R. J. Bakker et al., “Fast and Flexible BPM-System: Valuable Commissioning Tool for the BESSY II”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper WEP29G, pp. 1482-1484. |
|
R. Müller et al., “Orbit Drift Correction Using Correctors with Ultra-High DAC Resolution”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper MPPH301, pp. 1180-1182. |
|
P. Kuske et al., “Experience with the Beam Position Monitor System of the BESSY II Storage Ring”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper WEA84, pp. 2078-2080. |
|
J. G. Hwang et al., “A new button-type beam position monitor for BESSY II and BESSY VSR”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 508-512. |
|
G. Rehm, F. Falkenstern, J. Kuszynski, and A. Sch?ñlicke, “First Tests of Beam Position Monitor Electronics with Bunch Resolving Capabilities”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 2124-2127. |
|
A. Neumann et al., “bERLinPro Becomes SEALab: Status and Perspective of the Energy Recovery Linac at HZB”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 1110-1113. |
|
F. Falkenstern, J. Kuszynski, and G. Rehm, “Booster Fillpattern Monitor”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 473-475. |