|
A. Nassiri et al., “Status of the Short-Pulse X-ray Project at the Advanced Photon Source”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper WEPPC038, pp. 2292-2294. |
|
N. Sereno et al., “Beam Stability R&D for the APS MBA Upgrade”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1167-1169. |
|
F. Lenkszus et al., “Fast Injection System R&D for the APS Upgrade”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1797-1799. |
|
S. H. Kim, T. G. Berenc, J. Carwardine, G. Decker, M. P. Kelly, and P. N. Ostroumov, “Design Study of the Higher Harmonic Cavity for Advanced Photon Source Upgrade”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1819-1821. |
|
M. P. Kelly et al., “Superconducting Harmonic Cavity for the Advanced Photon Source Upgrade”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3267-3269. |
|
C. Yao et al., “Development of Fast Kickers for the APS MBA Upgrade”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3286-3288. |
|
M. Borland et al., “The Upgrade of the Advanced Photon Source”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 2872-2877. |
|
N. Sereno et al., “Beam Diagnostics for the APS MBA Upgrade”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1204-1207. |
|
N. Sereno et al., “First Beam Tests of the APS MBA Upgrade Orbit Feedback Controller”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 39-42. |
|
P. S. Kallakuri, N. D. Arnold, J. Carwardine, D. R. Paskvan, and N. Sereno, “Modeling the Fast Orbit Feedback Control System for APS Upgrade”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 196-198. |