JaCoW Logo

Reference Search

Author: V. Ganni


References



Reference
A. Hutton et al., “JLAB Hurricane Recovery”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper TUPKF068, pp. 1102-1104.
F. Casagrande et al., “SNS 2.1K Cold Box Turn-down Studies”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper MOPCH193, pp. 514-516.
F. Casagrande et al., “Status of the Cryogenic System Commissioning at SNS”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper WPAE005, pp. 970-972.
H. Ao et al., “FRIB Driver Linac Integration to be ready for Phased Beam Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 823-826.
H. Ao et al., “Installation Progress on FRIB =0.041 Cryomodules Toward Beam Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1087-1089.
J. Wei et al., “Accelerator Challenges of Hadron Linacs and the Facility for Rare Isotope Beams - Extending High Beam Power from Protons to Heavy Ions”, in Proc. 54th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'14), East Lansing, MI, USA, Nov. 2014, paper MOZLR07, pp. 12-17.
J. Wei et al., “Advances of the FRIB Project”, in Proc. 14th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'18), Lanzhou, China, Oct. 2018, pp. 7-12.
J. Wei et al., “FRIB Accelerator Status and Challenges”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper TU1A04, pp. 417-421.
J. Wei et al., “FRIB Accelerator: Design and Construction Status”, in Proc. 13th Int. Conf. on Heavy Ion Accelerator Technology (HIAT'15), Yokohama, Japan, Sep. 2015, paper MOM1I02, pp. 6-10.
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807.


Back to the list