|
K. Fuchsberger et al., “Determination of the Chromaticity of the TI 8 Transfer Line Based on Kick Response Measurements”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH6PFP038, pp. 3787-3789. |
|
M. Meddahi et al., “Machine Studies During Beam Commissioning of the SPS-to-LHC Transfer Lines”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH6PFP040, pp. 3793-3795. |
|
M. Lamont et al., “Operational Experience with First Circulating Beam in the LHC”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU6PFP057, pp. 1412-1414. |
|
B. Goddard et al., “Initial Results from Beam Commissioning of the LHC Beam Dump System”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU6RFP024, pp. 1584-1586. |
|
V. Mertens et al., “Beam Commissioning of Injection into the LHC”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU6RFP026, pp. 1590-1592. |
|
J. A. Uythoven et al., “Experience with the LHC Beam Dump Post-Operational Checks System”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU6RFP029, pp. 1599-1601. |
|
E. Gianfelice-Wendt et al., “LHC Abort Gap Cleaning with the Transverse Damper”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE6PFP017, pp. 2519-2521. |
|
R. Tom?ís et al., “First Beta-Beating Measurement in the LHC”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE6PFP021, pp. 2531-2533. |
|
F. Zimmermann et al., “Linear & Nonl. Optics Checks during LHC Injection Tests”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE6PFP026, pp. 2546-2548. |
|
R. I. Saban et al., “The Commissioning of the LHC Technical Systems”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FROAC03, pp. 3801-3803. |