|
J. Emery et al., “LHC BLM Single Channel Connectivity Test using the Standard Installation”, in Proc. 9th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'09), Basel, Switzerland, May 2009, paper TUPD26, pp. 354-356. |
|
C. Joly et al., “MTCA.4-Based LLRF System Prototype Status for MYRRHA”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 771-774. |
|
A. Gatera et al., “MYRRHA-MINERVA Injector Status and Commissioning”, in Proc. 64th Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'21), Batavia, IL, USA, Oct. 2021, paper WEBC3, pp. 186-190. |
|
A. Bellandi, E. Verhagen, F. Frank, J. Geerts, K. Geerts, and W. De Cock, “The MYRRHA phase 1 MTCA.4-based LLRF system”, presented at the 17th Int. Particle Accelerator Conf. (IPAC'26), Deauville, France, May 2026, paper WEP6145, this conference. |