|
Y. I. Levinsen, R. De Prisco, M. Eshraqi, R. Miyamoto, M. Munoz, and A. Ponton, “Beam Dynamics Challenges in the ESS Linac”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 315-318. |
|
Y. I. Levinsen et al., “Plans for the European Spallation Source Beam Physics Control Software”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 3086-3089. |
|
Y. I. Levinsen et al., “European Spallation Source Lattice Design Status”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3911-3914. |
|
T. A. Pelaia II et al., “Open XAL Status Report 2016”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 3083-3085. |
|
T. A. Pelaia II et al., “Open XAL Status Report 2015”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1270-1272. |
|
R. Miyamoto, M. Eshraqi, and M. Munoz, “ESS Linac Plans for Commissioning and Initial Operations”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 342-347. |
|
R. Miyamoto et al., “Preparation Towards the Ess Linac Ion Source and Lebt Beam Commissioning on Ess Site”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 874-877. |
|
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24. |
|
N. Milas et al., “ESS Commissioning Plans”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 127-132. |
|
M. Munoz, H. L. Owen, and S. L. Smith, “Optimisation of the Dynamic Aperture of DIAMOND”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper MOP043L, pp. 941-943. |