|
L. Huang, Y. D. Liu, and S. Wang, “Resistive Wall Instability in CSNS/RCS”, in Proc. 52nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'12), Beijing, China, Sep. 2012, paper WEO1A03, pp. 354-357. |
|
Y. Yuan, H. F. Ji, S. Wang, and J. Peng, “The Simulation Study of Beam Dynamics for CSNS Linac During Beam Commissioning”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 192-194. |
|
Y. W. An, H. F. Ji, Y. Li, S. Wang, S. Y. Xu, and J. Peng, “Study of Magnets Sorting of the CSNS/RCS Dipoles and Quadrupoles”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 247-249. |
|
M. Y. Huang et al., “Study on the Magnetic Measurement Results of the Injection System for CSNS/RCS”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 46-48. |
|
J. Peng et al., “Beam Commissioning Results for the CSNS MEBT and DTL-1”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 329-332. |
|
H. F. Ji, M. Y. Huang, Y. Jiao, N. Wang, S. Wang, and S. Y. Xu, “The Application of the Optimization Algorithm in the Collimation System for CSNS/RCS”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 397-399. |
|
S. Y. Xu et al., “Commissioning Status and Plans of CSNS/RCS”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 133-135. |
|
M. Y. Huang, S. Wang, and S. Y. Xu, “Study on the Leakage Fields of the Septum and Lambertson Magnets during the Beam Commissioning”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 303-305. |
|
M. Y. Huang, S. Wang, and S. Y. Xu, “Study on the Phase Space Painting Injection during the Beam Commissioning for CSNS”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 309-311. |
|
M. Y. Huang, D. P. Jin, L. Shen, S. Wang, S. Y. Xu, and P. Zhu, “Timing Adjustment of Eight Kickers and a Method to Calibrate the Kicker Current Curves During the Beam Commissioning for CSNS”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 312-314. |