JaCoW Logo

Reference Search

Author: S. Wang


References



Reference
G. Ciovati, P. Dhakal, R. A. Rimmer, H. Wang, and S. Wang, “Multipacting in C75 Cavities”, presented at the 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper WEPWB049, unpublished.
G. E. McMichael et al., “Accelerator Research on the Rapid Cycling Synchrotron at IPNS”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper MOPCH126, pp. 339-341.
G.-T. Park et al., “Status Update of a Harmonic Kicker Development for JLEIC”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 3047-3050.
G.-T. Park, F. Fors, J. Guo, R. A. Rimmer, H. Wang, and S. Wang, “The Development of a New Fast Harmonic Kicker for the JLEIC Circulator Cooling Ring”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1171-1173.
G.-T. Park, J. Guo, F. Marhauser, R. A. Rimmer, H. Wang, and S. Wang, “Beam Impedance Study on a Harmonic Kicker for the CCR of JLEIC”, in Proc. 63rd Advanced ICFA Beam Dynamics Workshop on Energy Recovery Linacs (ERL'19), Berlin, Germany, Sep. 2019, pp. 116-119.
H. C. Liu et al., “Low Power RF Tuning of the CSNS DTL”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 913-915.
H. C. Liu, S. Fu, J. Peng, and S. Wang, “DTL Construction Status of CSNS Project”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUIOB04, pp. 423-425.
H. F. Ji, M. Y. Huang, Y. Jiao, N. Wang, S. Wang, and S. Y. Xu, “The Application of the Optimization Algorithm in the Collimation System for CSNS/RCS”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 397-399.
H. Tian, M. Kelley, C. Reece, L. Plucinski, K. Smith, and S. Wang, “Surface Studies of Niobium Chemically Polished Under Conditions for SRF Cavity Production”, in Proc. 12th Int. Conf. RF Superconductivity (SRF'05), Ithaca, NY, USA, Jul. 2005, paper TUA10, pp. 193-193.
H. Wang et al., “Transient Beam Loading Due to the Bunch Train Gap and Its Compensation Experiments at BEPC-II and ALS”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 390-393.


Back to the list