|
R. I. Saban et al., “The Commissioning of the LHC Technical Systems”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FROAC03, pp. 3801-3803. |
|
S. D. Claudet, “Design, Construction, Installation and First Commissioning Results of the LHC Cryogenic System”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper FRXCPA01, pp. 3626-3630. |
|
S. D. Claudet, “Recent Progress in Power Refrigeration Below 2 K for Superconducting Accelerators”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper ROAD001, pp. 9-13. |
|
G. Vandoni et al., “An SRF Test Stand in High Intensity and High Energy Proton Beams”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 1187-1191. |