C. Hessler et al., “Results from the HiRadMat Primary Beam Line Commissioning”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper THPS053, pp. 3547-3549. |
|
I. Efthymiopoulos et al., “HiRadMat: A New Irradiation Facility for Material Testing at CERN”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper TUPS058, pp. 1665-1667. |
|
S. Evrard et al., “SPS WANF Dismantling: A Large Scale-Decommissioning Project at CERN”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper TUPS059, pp. 1668-1670. |
|
A. Fabich et al., “First Year of Operations in the HiRadMat Irradiation Facility at CERN”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPFI055, pp. 3415-3417. |
|
K. Foraz et al., “LHC Long Shutdown: A Parenthesis for a Challenge”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper TUPFI013, pp. 1355-1357. |
|
K. Foraz, E. Barbero-Soto, H. Gaillard, C. Hauviller, and S. Weisz, “Schedule evolution during the life-time of the LHC project”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPAN092, pp. 1592-1594. |
|
L. Lari, H. Gaillard, and V. Mertens, “Scheduling the Installation of the LHC Injection Lines”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper WEPLT024, pp. 1879-1881. |
|
S. Weisz, K. Foraz, H. Gaillard, and L. Lari, “Scheduling the Installation of the Large Hadron Collider”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper WEPLT042, pp. 1927-1929. |