JaCoW Logo

Reference Search

Author: H. Hassanzadegan


References



Reference
R. Miyamoto et al., “First Results of Beam Commissioning on the ESS Site for the Ion Source and Low Energy Beam Transport”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 1118-1121.
C. S. Derrez et al., “Initial Performance of the Beam Instrumentation for the ESS IS & LEBT”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 2650-2653.
D. C. Plostinar et al., “Status of the Normal Conducting Linac at the European Spallation Source”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2019-2022.
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24.
D. Noll et al., “First Beam Matching and Transmission Studies on the ESS RFQ”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 414-417.
T. Shea et al., “Commissioning of ESS normal-conducting linac instrumentation and implications for future hadron linacs”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper THPL091, pp. 4665-4668.
T. J. Shea et al., “Beam Instrumentation Performance During Commissioning of the ESS RFQ, MEBT and DTL”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 32-36.
Y. Levinsen et al., “First RF Phase Scans at the European Spallation Source”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 313-317.


Back to the list