|
C. H. Kuo, Y.-S. Cheng, P. C. Chiu, K. T. Hsu, K. H. Hu, and C.-Y. Liao, “Operation Status of Bunch-by-bunch Feedback System in the TLS”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPO015, pp. 514-516. |
|
C. H. Kuo et al., “Commissioning Tune Feedback in the Taiwan Light Source”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPO016, pp. 517-519. |
|
K. H. Hu et al., “RF Reference Distribution for the Taiwan Photon Source”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPO040, pp. 571-573. |
|
C. Y. Wu et al., “Preliminary Testing of TPS Timing System”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPO041, pp. 574-576. |
|
C. H. Kuo et al., “Preliminary BPM Electrics Testing for the Taiwan Photon Source Project”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper TUPC144, pp. 1362-1364. |
|
C.-Y. Liao et al., “Beam Profiles Analysis for Beam Diagnostic Applications”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper TUPC146, pp. 1368-1370. |
|
Y.-S. Cheng et al., “Virtual Power Supply Control Environment for the TPS Project”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper WEPC156, pp. 2349-2351. |
|
P. C. Chiu et al., “TLS Transportline BPM Upgrade”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper MOPPR051, pp. 897-899. |
|
Y.-S. Cheng et al., “Integrate EPICS System with the TLS Control System”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper THPPR010, pp. 3984-3986. |
|
C. Y. Wu et al., “Insertion Device Controls Plan of the Taiwan Photon Source”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper THPPR011, pp. 3987-3989. |