|
S. Weisz, E. Barbero-Soto, K. Foraz, and F. Rodriguez-Mateos, “Planning and Logistics Issues Raised by the Individual System Tests during the Installation of the LHC”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper THPCH185, pp. 3233-3235. |
|
E. Vergara Fernandez et al., “Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2048-2051. |
|
A.-L. Perrot et al., “The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2052-2055. |
|
F. Dos Santos Pedrosa et al., “PLAN - from LS2 to RUN3-LS3 and outcomes from the first RUN3-LS3 PLAN exercise”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPM074, pp. 2367-2370. |