|
O. Capatina et al., “Overview of the Large Hadron Collider Cryo-magnets Logistics”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper THPCH181, pp. 3221-3223. |
|
S. Chemli et al., “New Coordination Tools to Prepare Programmed Stops in the LHC and its Injectors”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 200-203. |
|
S. Weisz, E. Barbero-Soto, K. Foraz, and F. Rodriguez-Mateos, “Planning and Logistics Issues Raised by the Individual System Tests during the Installation of the LHC”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper THPCH185, pp. 3233-3235. |
|
S. Weisz, K. Foraz, H. Gaillard, and L. Lari, “Scheduling the Installation of the Large Hadron Collider”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper WEPLT042, pp. 1927-1929. |