|
K. Foraz et al., “Reliability and Intervention Management for the LHC”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper MOPPC012, pp. 148-150. |
|
K. Foraz et al., “LHC Long Shutdown: A Parenthesis for a Challenge”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper TUPFI013, pp. 1355-1357. |
|
M. Barberan Marin et al., “Integration, Configuration and Coordination: from Project to Reality, at CERN”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 1407-1409. |
|
K. Foraz, J. Coupard, and S. Grillot, “First LHC Shutdown: Coordination and Schedule Issues”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper MOPEC004, pp. 459-461. |
|
A.-L. Perrot et al., “The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2052-2055. |
|
F. Carra et al., “FCC-ee arc half-cell: preliminary design & integration studies, with ideas for a mock-up”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper MOPL061, pp. 678-681. |