|
S. Seletskiy et al., “Experience with First Turns Commissioning in NSLS-II Storage Ring”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1950-1952. |
|
S. Seletskiy et al., “High Level Application for First Turns Commissioning in NSLS-II Storage Ring”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1953-1955. |
|
W. X. Cheng et al., “Experimental Study of Single Bunch Instabilities at NSLS-II Storage Ring”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 1738-1740. |
|
M. Borland et al., “The Upgrade of the Advanced Photon Source”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 2872-2877. |
|
A. Blednykh et al., “Impedance Modeling for eRHIC”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1309-1311. |
|
V. Ptitsyn et al., “eRHIC Design Status”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 628-631. |
|
A. Blednykh et al., “A Comprehensive Study of the Microwave Instability”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 3224-3226. |
|
G. Bassi, A. Blednykh, J. Rose, V. V. Smaluk, and J. Tagger, “Synchronous Phase Shift from Beam Loading Analysis”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 3227-3229. |
|
O. Singh et al., “NSLS-II BPM and Fast Orbit Feedback System Design and Implementation”, in Proc. 2nd Int. Beam Instrumentation Conf. (IBIC'13), Oxford, UK, Sep. 2013, paper TUBL1, pp. 316-322. |
|
B. N. Kosciuk, A. Blednykh, and S. Seletskiy, “Construction and Operational Performance of a Horizontally Adjustable Beam Profile Monitor at NSLS-II”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOPF07, pp. 55-58. |