|
A. Stolz et al., “New Developments and Capabilities at the Coupled Cyclotron Facility at Michigan State University”, in Proc. 20th Int. Conf. on Cyclotrons and their Applications (Cyclotrons'13), Vancouver, Canada, Sep. 2013, paper MO1PB02, pp. 7-10. |
|
T. Ropponen, D. G. Cole, G. Machicoane, A. Stolz, L. T. Sun, and L. Tobos, “Bremsstrahlung and Ion Beam Current Measurements With SuSI ECR Ion Source”, in Proc. 19th Int. Workshop on ECR Ion Sources (ECRIS'10), Grenoble, France, Aug. 2010, paper WECOAK04, pp. 171-174. |
|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
T. Xu et al., “Completion of FRIB Superconducting Linac and Phased Beam Commissioning”, in Proc. 20th International Conference on RF Superconductivity (SRF'21), East Lansing, MI, USA, Jun.-Jul. 2021, pp. 197. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, presented at the 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, unpublished. |
|
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357. |
|
A. Stolz, “FRIB one year user operation”, presented at the 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper TUXD1, unpublished. |
|
X. Rao et al., “Operation status of FRIB wedge systems and plan for power ramp up”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper THPR24, pp. 3545-3548. |