|
F. Naito et al., “Input Coupler for the KEKB Normal Conducting Cavity”, in Proc. 16th Particle Accelerator Conf. (PAC'95), Dallas, TX, USA, May 1995, paper WPR09, pp. 1806-1808. |
|
F. Naito et al., “The Input Coupler for the KEKB ARES Cavity”, in Proc. 1st Asian Particle Accelerator Conf. (APAC'98), Tsukuba, Japan, Mar. 1998, paper 6D040, pp. 776-778. |
|
F. Tamura et al., “Beam Acceleration with Full-digital LLRF Control System in the J-PARC RCS”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC126, pp. 364-366. |
|
F. Tamura et al., “Development of the Beam Chopper Timing System for Multi-Turn Injection to the J-PARC RCS”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper WEPMN038, pp. 2125-2127. |
|
F. Tamura et al., “Development of the Feed-forward System for Beam Loading Compensation in the J-PARC RCS”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper TUPCH130, pp. 1319-1321. |
|
F. Tamura et al., “Low Level RF Control System of J-PARC Synchrotrons”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper WPAT064, pp. 3624-3626. |
|
H. Baba et al., “DC Power Supplies for 1MW Klystron in the TRISTAN Main Ring”, in Proc. 12th Particle Accelerator Conf. (PAC'87), Washington D.C., USA, Mar. 1987, pp. 1523-1526. |
|
H. Hayano and E. Ezura, “The Longitudinal Feedback System in TRISTAN AR”, in Proc. 11th Particle Accelerator Conf. (PAC'85), Vancouver, Canada, May 1985, pp. 2156-2159. |
|
H. Hayano and E. Ezura, “The RF Reference Line for TRISTAN”, in Proc. 12th Particle Accelerator Conf. (PAC'87), Washington D.C., USA, Mar. 1987, pp. 1663-1666. |
|
H. Nakai et al., “Status Report of Superconducting RF Activities in KEK”, in Proc. 10th Workshop RF Superconductivity (SRF'01), Tsukuba, Japan, Sep. 2001, paper TL019, pp. XX-XX. |