JaCoW Logo

Reference Search

Author: N. Gilbert


References



Reference
J. A. Uythoven et al., “Beam Commissioning of the SPS-to-LHC Transfer Line TI 2”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPP065, pp. 2668-2670.
K. Foraz et al., “Lessons Learned From the First Long Shutdown of the Lhc and Its Injector Chain”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 2050-2052.
K. Foraz et al., “LS1 ``First Long Shutdown of LHC and its Injector Chains''”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 1010-1012.
K. Hanke et al., “Status of the LIU Project at CERN”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 3397-3399.
K. Hanke et al., “Study of an Energy Upgrade of the CERN PS Booster”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper WEPS020, pp. 2526-2528.
S. Bartolome-Jimenez et al., “CERN Accelerators Topology Configuration: Facing the Next Long Shutdown”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 4066-4068.


Back to the list