|
F. J. Cullinan et al., “Development of a Cavity Beam Position Monitor for CLIC”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper MOPPR057, pp. 915-917. |
|
F. J. Cullinan et al., “A Prototype Cavity Beam Position Monitor for the CLIC Main Beam”, in Proc. 1st Int. Beam Instrumentation Conf. (IBIC'12), Tsukuba, Japan, Oct. 2012, paper MOPA18, pp. 95-97. |
|
L. S?©by, F. Guillot-Vignot, and I. Podadera Aliseda, “Precision Beam Position Monitor for EUROTeV”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH5RFP039, pp. 3534-3536. |
|
S. Liu et al., “The Installation and Commissioning of the AWAKE Stripline BPM”, in Proc. 7th Int. Beam Instrumentation Conf. (IBIC'18), Shanghai, China, Sep. 2018, pp. 253-256. |
|
M. Wendt, W. Andreazza, E. Bravin, and F. Guillot-Vignot, “Beam Induced Power Loss Estimation of a Movable Synchrotron Light Extraction Mirror for the LHC”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2173-2176. |
|
A. Rossi et al., “DC and pulsed electron beam test facility at CERN”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPL104, pp. 1971-1974. |
|
M. Bozzolan et al., “Improvements on the LHC Interlock BPM system”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper THPL090, pp. 4661-4664. |
|
M. Sameed et al., “Status of Beam Instrumentation at the Electron Beam Test Stand at CERN”, in Proc. 14th International Workshop on Beam Cooling and Related Topics (COOL2023), Montreux, Switzerland, Oct. 2023, paper TUPAM2R1, pp. 16-21. |