|
M. J. Shirakata et al., “Collimator Upgrade Plan of the J-PARC Main Ring”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper THPS035, pp. 3496-3498. |
|
M. J. Shirakata et al., “The Magnet Alignment Method For The J-PARC Main Ring”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper THPMA083, pp. 752-754. |
|
M. Yoshioka et al., “Installation and Radiation Maintanance Scenario for J-PARC 50 GeV Synchrotron”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper TUPMA102, pp. 247-249. |
|
I. Sato et al., “Accelerator Guide of Positron Generator Linac”, in Proc. 1986 Linear Accelerator Conf. (LINAC'86), Stanford, CA, USA, Jun. 1986, paper TH3-26, pp. 499-501. |
|
I. Sato et al., “Acceleration Characteristics of Positron Generator Linac”, in Proc. 1986 Linear Accelerator Conf. (LINAC'86), Stanford, CA, USA, Jun. 1986, paper TH3-27, pp. 502-504. |
|
H. Kobayashi et al., “Test Linac Facility at Photon Factory, KEK”, in Proc. 1990 Linear Accelerator Conf. (LINAC'90), Albuquerque, NM, USA, Sep. 1990, paper TH406, pp. 596-598. |
|
A. Enomoto et al., “Present Status and Reinforcement Plan of the KEK Positron Generator”, in Proc. 1990 Linear Accelerator Conf. (LINAC'90), Albuquerque, NM, USA, Sep. 1990, paper TH415, pp. 623-625. |
|
S. Ohsawa et al., “Improvements to the Injection System of the KEK 2.5-GeV Linac”, in Proc. 1992 Linear Accelerator Conf. (LINAC'92), Ottawa, Canada, Aug. 1992, paper MO4-19, pp. 91-93. |
|
T. Kamitani et al., “A Simulation Study on KEK Positron Generator”, in Proc. 1992 Linear Accelerator Conf. (LINAC'92), Ottawa, Canada, Aug. 1992, paper TU4-29, pp. 377-379. |
|
A. Enomoto et al., “Re-formation of the PF 2.5-GeV Linac to 8 GeV”, in Proc. 1994 Linear Accelerator Conf. (LINAC'94), Tsukuba, Japan, Aug. 1994, paper MO-54, pp. 184-186. |