|
L. R. Williams et al., “Design of the High Beta Cryomodule for the HIE-ISOLDE Upgrade at CERN”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPC105, pp. 319-321. |
|
Y. Leclercq et al., “The Assembly Experience of the First Cryo-module for HIE-ISOLDE at CERN”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3131-3133. |
|
W. Venturini Delsolaro et al., “HIE-ISOLDE: First Commissioning Experience”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 2230-2233. |
|
Y. Kadi et al., “Status of Radioactive Ion Beam Post-Acceleration at CERN-ISOLDE”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2466-2469. |
|
W. Venturini Delsolaro et al., “Status of the HIE-ISOLDE Linac”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THIOA03, pp. 795-800. |
|
M. Therasse et al., “Assembling Experience of the First Two HIE-ISOLDE Cryomodules”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 805-807. |
|
W. Venturini Delsolaro et al., “HIE-ISOLDE SC Linac Progress and Commissioning in 2016”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 663-667. |
|
W. Venturini Delsolaro et al., “Status of the SRF Systems at HIE-ISOLDE”, in Proc. 17th Int. Conf. RF Superconductivity (SRF'15), Whistler, Canada, Sep. 2015, paper TUBA01, pp. 481-487. |
|
W. Venturini Delsolaro et al., “HIE Isolde Cavity Production & Cryomodule Commissioning, Lessons Learned”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 338-344. |