JaCoW Logo

Reference Search

Author: M. Kuntzsch


References



Reference
G. Varghese et al., “ChimeraTK - A Software Tool Kit for Control Applications”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 1798-1801.
M. Kuntzsch et al., “Electron Bunch Diagnostic at the Upgraded ELBE Accelerator: Status and Challenges”, in Proc. 2nd Int. Beam Instrumentation Conf. (IBIC'13), Oxford, UK, Sep. 2013, paper MOBL3, pp. 23-25.
R. Schurig et al., “Overview on Electron Bunch and Photon Beam Diagnostic Techniques for CW Linear Accelerators Using the Example of ELBE”, in Proc. 2nd Int. Beam Instrumentation Conf. (IBIC'13), Oxford, UK, Sep. 2013, paper MOPC38, pp. 158-158.
M. Kuntzsch et al., “CW Beam Stability Analysis in Time and Frequency Domain”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOPD15, pp. 179-181.
M. Kuntzsch, M. Gensch, U. Lehnert, P. Michel, R. Schurig, and J. Teichert, “Jitter Analysis at CW Repetition Rate With Large Spectral Range and High Resolution”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 43-45.
R. Steinbr??ck, M. Justus, M. Kuntzsch, T. Bergmann, and A. Kessler, “Trigger Generator for the Superconducting Linear Accelerator ELBE”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 46-48.
J. M. Kraemer et al., “Bunch Arrival-Time Monitoring for Laser Particle Accelerators and Thomson Scattering X-Ray Sources”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 468-470.
M. Kuntzsch et al., “MicroTCA.4-Based LLRF for CW Operation at ELBE - Status and Outlook”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 101-103.
M. Kuntzsch et al., “Status of the Femtosecond Synchronization System at ELBE”, in Proc. 15th Beam Instrumentation Workshop (BIW'12), Newport News, VA, USA, Apr. 2012, paper MOBP03, pp. 12-14.
M. Kuntzsch, A. Buechner, T. Kirschke, U. Lehnert, and F. Roeser, “Future Timing and Synchronization Scheme at ELBE”, in Proc. 10th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'11), Hamburg, Germany, May 2011, paper MOPD31, pp. 116-118.


Back to the list