JaCoW Logo

Reference Search

Author: K. Hosoyama


References



Reference
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807.
J. Wei et al., “FRIB Project Status and Beam Instrumentation Challenges”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 1-7.
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, presented at the 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, unpublished.
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.
J. Wei et al., “The FRIB Superconducting Linac - Status and Plans”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. XX-XX.
J. Yoshida et al., “Development of STF Cryogenic System in KEK”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper THICKI04, pp. 2701-2703.
K. Akai et al., “A Prototype Module of Superconducting Damped Cavity for KEKB”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper WEP051L, pp. 2121-2123.
K. Akai et al., “Commissioning and Beam Operation of KEKB Crab RF System”, in Proc. 13th Int. Conf. RF Superconductivity (SRF'07), Beijing, China, Oct. 2007, paper WEP57, pp. XX-XX.
K. Akai et al., “Commissioning of the KEKB B-FACTORY”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper WEAR4, pp. 288-292.
K. Akai et al., “Commissioning of the KEKB RF System”, in Proc. 7th European Particle Accelerator Conf. (EPAC'00), Vienna, Austria, Jun. 2000, paper TUP4A07, pp. 1939-1941.


Back to the list