JaCoW Logo

Reference Search

Author: L. J. Bitteker


References



Reference
M. S. Gulley et al., “Dual-Energy Operations at LANSCE for Proton Induced Nuclear Cross Section Measurements”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU6PFP021, pp. 1337-1339.
J. D. Gilpatrick et al., “Operation of the Position Measurements for the Isotope Production Facility”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper THPLT152, pp. 2813-2815.
K. F. Johnson et al., “Commissioning and Initial Operation of the Isotope Production Facility at the Los Alamos Neutron Science Center”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper THPLT153, pp. 2816-2818.
M. S. Gulley et al., “The LANSCE Switchyard Kicker Project”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper MPPT055, pp. 3310-3312.
C. Pillai et al., “Exploring the Energy/Beam Current Parameter Space for the Isotope Production Facility (IPF) at LANSCE”, in Proc. 25th Linear Accelerator Conf. (LINAC'10), Tsukuba, Japan, Sep. 2010, paper MOP061, pp. 193-195.


Back to the list