|
A. Y. Zelinsky et al., “The First Results of the NESTOR Commissioning”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper MOPEA063, pp. 225-227. |
|
A. Y. Zelinsky et al., “Start-up of the NESTOR Facility Vacuum System”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper THPFI079, pp. 3478-3480. |
|
A. A. Shcherbakov et al., “The Kharkov X-ray Generator Facility NESTOR”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPWA060, pp. 2253-2255. |
|
A. A. Shcherbakov et al., “Commissioning of the Storage Ring for the Kharkov Generator of X-Ray Radiation NESTOR”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 4307-4309. |
|
A. Y. Zelinsky et al., “The First Results of Trial Operation and Performance Improve of the 100 MeV/ 100 kW Electron Linear Accelerator of the NSC KIPT SCA Neutron Source”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 4693-4695. |
|
A. Y. Zelinsky et al., “Test and Commissioning Results of NSC KIPT 100 MeV/ 100 kW Electron Linear Accelerator, Subcritical Neutron Source Driver”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 1751-1753. |
|
I. M. Karnaukhov et al., “Status of Kharkov X-ray Generator NESTOR Based on Compton Back Scattering”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC047, pp. 175-177. |
|
A. Y. Zelinsky et al., “Status of NESTOR Facility”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper WEPEA063, pp. 2630-2632. |
|
O. Bezditko, I. I. Karnaukhov, and A. Y. Zelinsky, “Survey and Alignment System of 100 MeV/100 kW Electron Linear Accelerator”, in Proc. 29th Linear Accelerator Conf. (LINAC'18), Beijing, China, Sep. 2018, pp. 87-89. |