|
P. Wise et al., “Mechanical Engineering for the Front End Test Stand”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper MO6RFP041, pp. 448-450. |
|
J. W. G. Thomason et al., “The RFQ Test Stand Ion Source at RAL”, in Proc. 8th European Particle Accelerator Conf. (EPAC'02), Paris, France, Jun. 2002, paper THPRI011, pp. 1741-1743. |
|
V. C. Cloke and M. Perkins, “Stabilising the Voltage of the DC Accelerating Column of the ISIS Pre-injector using a Beam Current Controlled 'Bouncer'”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper MOP106G, pp. 2364-2366. |
|
P. J. S. Barratt, A. P. Letchford, M. Perkins, C. W. Planner, and R. Sidlow, “Operational Experience of Penning H- Ion Sources at ISIS”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper THP084L, pp. 1525-1527. |
|
P. J. S. Barratt, A. P. Letchford, M. Perkins, and R. Sidlow, “A New Remote Control and Monitoring System for the ISIS Ion Source on the 665 kV DC Accelerating Platform”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper TUP081L, pp. 1806-1808. |
|
A. P. Letchford, D. C. Faircloth, D. J. S. Findlay, M. Perkins, A. F. Stevens, and M. Whitehead, “Testing, Installation, Commissioning and First Operation of the ISIS RFQ Pre-Injector Upgrade”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper ROPC010, pp. 695-697. |