JaCoW Logo

Reference Search

Author: R. Mueller


References



Reference
R. Bakker, D. Kraemer, B. Kuske, P. Kuske, R. Mueller, and E. Weihreter, “Orbit Response Measurements in the Commissioning of the BESSY II Booster Synchrotron and Storage Ring”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper THP16G, pp. 900-902.
R. Bakker et al., “Rapidly Installable High Performance Control System Facilitates BESSY II Commissioning”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper TUP10C, pp. 1676-1678.
R. J. Bakker et al., “Fast and Flexible BPM-System: Valuable Commissioning Tool for the BESSY II”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper WEP29G, pp. 1482-1484.
R. Bakker, T. Birke, and R. Mueller, “Signal Archiving and Retrieval: Essential Long Term Performance Tuning Tool”, in Proc. 8th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'01), San Jose, CA, USA, Nov. 2001, paper FRBT005, pp. XX-XX.
K. Burkmann et al., “Corrector Power Supplies with a DAC Resolution up to 24 Bits Based on 16 Bit DAC Devices”, in Proc. 8th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'01), San Jose, CA, USA, Nov. 2001, paper TUAP050, pp. XX-XX.
T. Birke, B. Franksen, R. Lange, P. Laux, and R. Mueller, “Introducing I/O Channels into the Device Database Opens New Potentialities for Configuration Management”, in Proc. 8th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'01), San Jose, CA, USA, Nov. 2001, paper WEDT003, pp. XX-XX.
R. Müller et al., “Orbit Drift Correction Using Correctors with Ultra-High DAC Resolution”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper MPPH301, pp. 1180-1182.
D. S. Robin et al., “Superbend Project at the Advanced Light Source”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper WPPH077, pp. 2632-2634.
R. Bakker, T. Birke, and R. Mueller, “Is Comprehensive and Intuitively Usable Commissioning Software Feasible?”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper MOP31, pp. 726-728.
P. Kuske et al., “Experience with the Beam Position Monitor System of the BESSY II Storage Ring”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper WEA84, pp. 2078-2080.


Back to the list