|
M. Modena et al., “Final Prototypes, First Pre-Series Units and Steps Towards Series Production of the LHC Main Dipoles”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper TOAB003, pp. 186-188. |
|
M. Modena et al., “Status of the LHC Main Dipole Pre-Series Production”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper WPAE005, pp. 1942-1944. |
|
S. Yammine et al., “Hardware Commissioning of the HL-LHC Inner Triplet String Facility at CERN: Individual System and Short Circuit Tests”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper THPS50, pp. 3853-3856. |
|
S. Yammine et al., “Preparing the commissioning of the HL-LHC superconducting magnet circuits: from the inner triplet string to the CERN accelerator complex”, presented at the 16th Int. Particle Accelerator Conf. (IPAC'25), Taipei, Taiwan, Jun. 2025, paper WEPB035, this conference. |
|
F. P. Nicoletti et al., “Continuous improvement in long-term multi-phased complex projects: insights from the HL-LHC case study”, presented at the 16th Int. Particle Accelerator Conf. (IPAC'25), Taipei, Taiwan, Jun. 2025, paper THPB020, this conference. |