|
Z. Q. He et al., “Development Status of FRIB On-line Model Based Beam Commissioning Application”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 100-103. |
|
T. Zhang, K. Fukushima, M. Ikegami, D. G. Maxwell, and P. N. Ostroumov, “High-level Physics Controls Applications Development for FRIB”, in Proc. 17th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'19), New York, NY, USA, Oct. 2019, pp. 829. |
|
T. Yoshimoto et al., “Ion Beam Studies in the FRIB Front End”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1094-1096. |
|
T. Yoshimoto et al., “Beam Envelope Reconstruction for FRIB-FS1 Transport Line Using Beam Position Monitors”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 810-812. |
|
T. Maruta et al., “Status of Beam Commissioning in FRIB Driver Linac”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 951-953. |
|
S. L. Sheehy et al., “Experimental Studies of Resonance Crossing in Linear Non-scaling FFAGs With the S-POD Plasma Trap”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPEA072, pp. 2675-2677. |
|
P. Ostroumov et al., “Accelerator and beam physics challenges in support of FRIB experiments”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPA180, pp. 1729-1732. |
|
P. N. Ostroumov et al., “FRIB from Commissioning to Operation”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper MOA1I2, pp. 9-15. |
|
P. N. Ostroumov et al., “FRIB Commissioning”, in Proc. 15th International Conference on Heavy Ion Accelerator Technology (HIAT'22), Darmstadt, Germany, Jun.-Jul. 2022, pp. 118-123. |
|
M. Muramatsu et al., “Design of Compact ECR Ion Source for C5+ Production”, in Proc. 22nd Int. Workshop on ECR Ion Sources (ECRIS'16), Busan, Korea, Aug.-Sep. 2016, pp. 64-66. |