JaCoW Logo

Reference Search

Author: E. Bjorklund


References



Reference
K. F. Johnson et al., “Commissioning and Initial Operation of the Isotope Production Facility at the Los Alamos Neutron Science Center”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper THPLT153, pp. 2816-2818.
M. Pieck et al., “LANSCE Control System Upgrade Status and Challenges”, in Proc. 15th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'15), Melbourne, Australia, Oct. 2015, pp. 464-467.
M. Pieck et al., “MaRIE Injector Test-Stand Instrumentation & Control System Conceptual Design”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 3198-3201.
M. Pieck et al., “The LANSCE Control System Current State and Upgrade Outlook”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper MOPAS052, pp. 554-556.
M. S. Gulley et al., “The LANSCE Switchyard Kicker Project”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper MPPT055, pp. 3310-3312.
R. B. Merl, S. A. Baily, E. Bjorklund, R. C. Clanton, and F. E. Shelley, “The LANSCE Timing Reference Generator”, in Proc. 14th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'13), San Francisco, CA, USA, Oct. 2013, paper THPPC112, pp. 1321-1324.
S. Schaller et al., “The LANSCE RICE Control System Upgrade”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper WPPE013, pp. 2354-2356.
W. Smith and E. Bjorklund, “A CAMAC-Based Knob Controller for the LAMPF Control System”, in Proc. 12th Particle Accelerator Conf. (PAC'87), Washington D.C., USA, Mar. 1987, pp. 544-547.


Back to the list