|
M. Pieck et al., “MaRIE Injector Test-Stand Instrumentation & Control System Conceptual Design”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 3198-3201. |
|
M. Pieck et al., “LANSCE Control System Upgrade Status and Challenges”, in Proc. 15th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'15), Melbourne, Australia, Oct. 2015, pp. 464-467. |
|
M. Pieck et al., “Recent Enhancements to the Los Alamos Isotope Production Facility”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 548-552. |
|
M. Pieck et al., “The LANSCE Control System Current State and Upgrade Outlook”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper MOPAS052, pp. 554-556. |
|
K. F. Johnson et al., “Commissioning and Initial Operation of the Isotope Production Facility at the Los Alamos Neutron Science Center”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper THPLT153, pp. 2816-2818. |
|
M. S. Gulley et al., “The LANSCE Switchyard Kicker Project”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper MPPT055, pp. 3310-3312. |
|
S. C. Schaller et al., “Completion of the LANSCE Proton Storage Ring Control System Upgrade - A Successful Integration of EPICS into a Running Control System”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 3P045, pp. 2464-2466. |