|
K. F. Johnson et al., “Commissioning and Initial Operation of the Isotope Production Facility at the Los Alamos Neutron Science Center”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper THPLT153, pp. 2816-2818. |
|
M. S. Gulley et al., “The LANSCE Switchyard Kicker Project”, in Proc. 21st Particle Accelerator Conf. (PAC'05), Knoxville, TN, USA, May 2005, paper MPPT055, pp. 3310-3312. |
|
W. C. Barkley et al., “First Results of the Analytical Method Used to Reduce Downtime Risk at an Accelerator Facility”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 4349-4351. |
|
C. Pillai et al., “The LANSCE Low Momentum Beam Monitor”, in Proc. 22nd Linear Accelerator Conf. (LINAC'04), Lübeck, Germany, Aug. 2004, paper TUP68, pp. 423-425. |