|
K. Foraz et al., “Lessons Learned From the First Long Shutdown of the Lhc and Its Injector Chain”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 2050-2052. |
|
W. Venturini Delsolaro et al., “Status of the HIE-ISOLDE Linac”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper THIOA03, pp. 795-800. |
|
M. B. Bajko et al., “The Inner Triplet String Facility for HL-LHC: Design and Planning”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 3592-3595. |
|
E. Vergara Fernandez et al., “Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2048-2051. |
|
A.-L. Perrot et al., “The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2052-2055. |
|
E. Vergara Fernandez et al., “Scheduling tools development to manage CERN accelerators programmed stops and facilities installations”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPM073, pp. 2364-2366. |
|
F. Dos Santos Pedrosa et al., “PLAN - from LS2 to RUN3-LS3 and outcomes from the first RUN3-LS3 PLAN exercise”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPM074, pp. 2367-2370. |
|
E. Guran et al., “AWAKE from Run 2a to Run 2b”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper TUPA094, pp. 1537-1540. |
|
E. Vergara Fernandez, M. Barberan Marin, M. Bernardini, and S. Fleury, “Schedule management for large scale projects: the example of HL-LHC at CERN”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper TUPS07, pp. 1641-1644. |