|
E. Khabibullina, L. Bellan, M. Comunian, A. Pisent, and A. D. Russo, “Beam Dynamic of Transport Line 1+ with New HRMS for the SPES Project”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 114-116. |
|
F. Grespan et al., “ESS Drift Tube Linac Manufacturing, Assembly and Tuning”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 1797-1800. |
|
F. Grespan et al., “High Power RF Conditioning of the ESS DTL1”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 356-359. |
|
F. Grespan et al., “IFMIF/EVEDA RFQ Beam Commissioning at Nominal 125 mA Deuteron Beam in Pulsed Mode”, in Proc. 11th Int. Particle Accelerator Conf. (IPAC'20), Caen, France, May 2020, pp. 21. |
|
F. Grespan et al., “Status and overview of the activities on ESS DTLs”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper MOPL127, pp. 851-854. |
|
G. Bisoffi et al., “Hardware Commissioning of the Refurbished Alpi LINAC at INFN-LNL to Serve as Spes Exotic Beam Accelerator”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 3650-3652. |
|
G. Bisoffi et al., “Hardware Commissioning of the Renovated PIAVE Injector at INFN-LNL”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 949-952. |
|
G. Bisoffi et al., “Progress in the Realization and Commissioning of the Exotic Beam Facility SPES at INFN-LNL”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1035-1037. |
|
I. Podadera et al., “Beam Commissioning of Beam Position and Phase Monitors for LIPAc”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 534-538. |
|
I. Podadera et al., “Commissioning Plan of the IFMIF-DONES Accelerator”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 330-333. |