|
Y. F. Sui, J. S. Cao, H. Z. Ma, Q. Ye, L. Yu, and J. H. Yue, “The Cold Beam Position Monitors for the C-ADS Injector I Proton Linac”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 298-300. |
|
J. He, J. S. Cao, Y. F. Sui, and J. H. Yue, “Preliminary Study on IPM for CADS Injector I”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 381-383. |
|
Y. F. Sui et al., “Beam Commissioning of C-ADS Linac Instrumentation”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 529-531. |
|
Q. Qin et al., “Overview of the CEPC Accelerator”, in Proc. 55th ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e- Colliders - Higgs Factory (HF'14), Beijing, China, Oct. 2014, paper THP3H2, pp. 16-21. |
|
J. H. Yue, R. X. Yuan, L. Ma, and J. Cao, “The Design of the Stripline Kicker for the BEPCII Transverse Feedback System”, in Proc. 3rd Asian Particle Accelerator Conf. (APAC'04), Gyeongju, Korea, Mar. 2004, paper THP16007, pp. XX-XX. |
|
R. X. Yuan, J. Cao, L. Ma, and J. H. Yue, “BPM Simulation of BEPCII”, in Proc. 3rd Asian Particle Accelerator Conf. (APAC'04), Gyeongju, Korea, Mar. 2004, paper THP16012, pp. XX-XX. |
|
J. He and J. H. Yue, “Bunch Purity Measurement and Improvement”, presented at the 9th Int. Beam Instrumentation Conf. (IBIC'20), Santos, Brazil, Sep. 2020, paper TUPP01, unpublished. |
|
J. H. Yue et al., “Consideration and Design of HEPS Beam Instrumentation”, presented at the 9th Int. Beam Instrumentation Conf. (IBIC'20), Santos, Brazil, Sep. 2020, paper THPP31, unpublished. |
|
S. J. Wei et al., “HEPS Storage Ring BPM Development”, presented at the 9th Int. Beam Instrumentation Conf. (IBIC'20), Santos, Brazil, Sep. 2020, paper FRAO06, unpublished. |
|
P. He et al., “Progress of HEPS Accelerator System Design”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 633-635. |