|
M. E. Angoletta et al., “Longitudinal Beam Diagnostic from a Distributed Electrostatic Pick-Up in CERN's ELENA Ring”, in Proc. 2nd Int. Beam Instrumentation Conf. (IBIC'13), Oxford, UK, Sep. 2013, paper WEPF28, pp. 883-886. |
|
R. Marco-Hernandez et al., “A New Orbit System for the CERN Antiproton Decelerator”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 465-469. |
|
O. Marqversen et al., “The Orbit Measurement System for the CERN Extra Low Energy Antiproton Ring”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 206-208. |
|
M. Jaussi et al., “A Digital System for Longitudinal Emittance Blow-Up in the LHC”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper MOPKS024, pp. 215-218. |
|
M. E. Angoletta et al., “CERN's PS Booster LLRF Renovation: Plans and Initial Beam Tests”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper TUPEA056, pp. 1461-1463. |
|
M. E. Angoletta et al., “CERN's LEIR Digital LLRF: System Overview and Operational Experience”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper TUPEA057, pp. 1464-1466. |
|
A. C. Butterworth et al., “First Beam Commissioning of the 400 MHz LHC RF System”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE5PFP074, pp. 2180-2182. |