|
B. Bellesia et al., “Short Circuit Tests: First Step of LHC Hardware Commissioning Completion”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC103, pp. 304-306. |
|
K. H. Mess, G.-J. Coelingh, and K. Dahlerup-Petersen, “Results from Commissioning of the Energy Extraction Facilities of the LHC Machine”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper TUPC134, pp. 1383-1385. |
|
A. P. Verweij et al., “Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPD029, pp. 2473-2475. |
|
F. Formenti et al., “Upgrade of the Quench Protection Systems for the Superconducting Circuits of the LHC Machine at CERN: From Concept and Design to the First Operational Experience”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper MOPD013, pp. 696-698. |
|
R. I. Saban et al., “The Commissioning of the LHC Technical Systems”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FROAC03, pp. 3801-3803. |
|
V. Ovchar, E. Kuper, and G.-J. Coelingh, “ARC DETECTOR SYSTEM FOR EXTRACTION SWITCHES IN LHC CERN”, in Proc. 20th Russian Particle Accelerator Conf. on Charged Particle Accelerators (RuPAC'06), Novosibirsk, Russia, Sep. 2006, paper MODP24, pp. XX-XX. |
|
A. Apollonio et al., “Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 335-338. |