|
X. Sun, H. Bui, G. Decker, R. T. Keane, R. M. Lill, and B. X. Yang, “Modernization of the Bergoz Multiplexed BPM System for the APS Upgrade”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper THPAC08, pp. 1154-1156. |
|
W. E. Norum et al., “First Full-Sector Closed-Loop Operational Experience for the FPGA-Based Broadband Beam Position Monitor at the APS”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TH5RFP004, pp. 3441-3443. |
|
S. Xu et al., “Comparative Measurements of Libera Brilliance and BSP100”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper MOPE083, pp. 1176-1178. |
|
R. T. Keane, H. Bui, G. Decker, M. Hahne, P. Leban, and C. Wimmer, “Evaluation of a Variety of Photon Beam Position Monitor Data Acquisition Methodologies at the APS”, in Proc. 15th Beam Instrumentation Workshop (BIW'12), Newport News, VA, USA, Apr. 2012, paper MOPG011, pp. 47-49. |
|
R. Lipa et al., “APS Fast Orbit Feedback System Upgrade”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper THPHO03, pp. 1301-1303. |
|
N. Sereno et al., “First Beam Tests of the APS MBA Upgrade Orbit Feedback Controller”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 39-42. |
|
N. Sereno et al., “Beam Stability R&D for the APS MBA Upgrade”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1167-1169. |
|
N. Sereno et al., “Beam Diagnostics for the APS MBA Upgrade”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1204-1207. |
|
H. Bui, G. Decker, R. M. Lill, W. E. Norum, and A. F. Pietryla, “Performance of FPGA-based Data Acquisition for the APS Broadband Beam Position Monitor System”, in Proc. 13th Beam Instrumentation Workshop (BIW'08), Lake Tahoe, CA, USA, May 2008, paper TUPTPF001, pp. 80-84. |
|
H. Bui et al., “Feedback Controller Development for the APS-MBA Upgrade”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 203-205. |