|
J. Ph. G. L et al., “The Second LHC Long Shutdown (LS2) for the Superconducting Magnets”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 240-243. |
|
W. Venturini Delsolaro et al., “Performance of the Superconducting Corrector Magnet Circuits during the Commissioning of the LHC”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPD028, pp. 2470-2472. |
|
A. P. Verweij et al., “Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPD029, pp. 2473-2475. |
|
R. I. Saban et al., “The Commissioning of the LHC Technical Systems”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FROAC03, pp. 3801-3803. |