|
D. M?ñder et al., “Status and Development of the MYRRHA Injector”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 432-434. |
|
R. Modic, M. Pavleski, T. Zagar, J. Belmans, P. Della Faille, and D. Vandeplassche, “MYRRHA Control System Development”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 4823-4825. |
|
D. Vandeplassche et al., “Integrated Prototyping in View of the 100 MeV Linac for Myrrha Phase 1”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 661-664. |
|
F. Bouly et al., “Commissioning of the MYRRHA Low Energy Beam Transport Line and Space Charge Compensation Experiments”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 1226-1229. |
|
D. Vandeplassche, J. Belmans, W. De Cock, R. Modic, K. Strnisa, and K. Zagar, “MYRRHA Control System Development”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 1527-1529. |
|
D. M?ñder et al., “Construction of the MYRRHA Injector”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 2221-2223. |
|
H. Podlech et al., “The MYRRHA Project”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 945-950. |
|
S. Lamprecht et al., “Conditioning of the Frontline Cavities of the MYRRHA Injector”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 895-897. |
|
S. Lamprecht et al., “Conditioning of the Frontline Cavities of the MYRRHA Injector”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 895-897. |
|
A. Gatera et al., “Minerva (MYRRHA Phase 1) RFQ Beam Commissioning”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 675-678. |