|
E. Pozdeyev et al., “FRIB Front End Construction and Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 58-62. |
|
H. T. Ren et al., “Commissioning of the FRIB RFQ”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1090-1093. |
|
D. G. Morris et al., “RF System for FRIB Accelerator”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1765-1770. |
|
S. H. Kim et al., “Experience and Lessons in FRIB Superconducting Quarter-Wave Resonator Commissioning”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 646-649. |
|
H. Maniar, E. Daykin, D. G. Morris, A. S. Plastun, H. T. Ren, and S. Zhao, “Python Scripts for RF Commissioning at FRIB”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 563-565. |
|
H. T. Ren et al., “Commissioning Status of the FRIB Front End”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 813-816. |
|
S. Zhao et al., “The LLRF Control Design and Validation at FRIB”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 667-669. |
|
W. Chang et al., “Bunker Testing of FRIB Cryomodules”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 765-767. |
|
W. Chang et al., “Progress in FRIB Cryomodule Bunker Tests”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 1029-1034. |
|
H. Maniar, B. E. Chase, J. E. Dusatko, S. Khole, and D. Sharma, “PIP-II 800 MeV Proton Linac Beam Pattern Generator”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 4426-4428. |