|
S. Di Carlo et al., “Early Phase 2 Results of LumiBelle2 for the SuperKEKB Electron Ring”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 2934-2937. |
|
C. G. Pang et al., “First Tests of Superkekb Fast Luminosity Monitors During 2018 Phase-2 Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 2254-2257. |
|
P. Bambade et al., “Fast Luminosity Monitoring for the SuperKEKB Collider (LumiBelle2 Project)”, in Proc. 62nd ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e- Colliders (eeFACT'18), Hong Kong, China, Sep. 2018, pp. 173. |
|
Y. Funakoshi et al., “Early Commissioning of the Luminosity Dither System for SuperKEKB”, in Proc. 62nd ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e- Colliders (eeFACT'18), Hong Kong, China, Sep. 2018, pp. 212. |
|
C. G. Pang et al., “Fast Luminosity Monitoring for the SuperKEKB Collider (LumiBelle2 Project)”, in Proc. 7th Int. Beam Instrumentation Conf. (IBIC'18), Shanghai, China, Sep. 2018, pp. 51-56. |
|
M. Masuzawa et al., “Early Commissioning of the Luminosity Dither Feedback for SuperKEKB”, in Proc. 7th Int. Beam Instrumentation Conf. (IBIC'18), Shanghai, China, Sep. 2018, pp. 328-331. |
|
F. Roncarolo et al., “Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 976-979. |
|
S. Di Carlo et al., “Assessing the Performance of the New Beam Wire Scanners for the CERN LHC Injectors”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 443-446. |