|
P. T. Griffin-Hicks, B. Jones, B. G. Pine, C. M. Warsop, and M. Wright, “Experimental Measurements of Resonances near to the ISIS Working Point”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1132-1135. |
|
S. J. Payne et al., “Beam Diagnostics at ISIS”, in Proc. 42nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'08), Nashville, TN, USA, Aug. 2008, paper WGF10, pp. 466-471. |
|
D. J. Adams et al., “Beam Loss Control in the ISIS Accelerator Facility”, in Proc. 52nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'12), Beijing, China, Sep. 2012, paper THO1C02, pp. 560-564. |
|
D. J. Adams et al., “Operational Experience and Future Plans at ISIS”, in Proc. 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'16), Malmö, Sweden, Jul. 2016, pp. 333-337. |
|
G. V. Eremeev et al., “4 K SRF Operation of the 10 MeV CEBAF Photo-Injector”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 155-157. |
|
J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20. |
|
J. Wei et al., “FRIB Commissioning and Early Operations”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 802-807. |
|
J. Wei et al., “FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOIAA01, pp. 1-8. |
|
J. Wei et al., “FRIB Beam Power Ramp-up: Status and Plans”, in Proc. HB'23 (HB), Geneva, Switzerland, Oct. 2023, paper THC1I2, pp. 351-357. |