|
C.-K. Ng, T. Weiland, D. Martin, S. Smith, and N. Kurita, “Simulation of PEP-II Beam Position Monitors”, in Proc. 16th Particle Accelerator Conf. (PAC'95), Dallas, TX, USA, May 1995, paper MPQ15, pp. 2485-2487. |
|
N. Kurita, D. Martin, S. Smith, C. Ng, M. Nordby, and C. Perkins, “Design of the Button Beam Position Monitor for PEP-II”, in Proc. 16th Particle Accelerator Conf. (PAC'95), Dallas, TX, USA, May 1995, paper MPQ25, pp. 2512-2514. |
|
U. Wienands et al., “The Vacuum System for the PEP II High Energy Ring Straight Sections”, in Proc. 16th Particle Accelerator Conf. (PAC'95), Dallas, TX, USA, May 1995, paper TAA22, pp. 2129-2131. |
|
U. Beck et al., “SPEAR 3 - A Low Emittance Source for SSRL”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper TUCL6, pp. 206-208. |
|
A. S. Fisher et al., “Design and Initial Commissioning of Beam Diagnostics for the PEP-II B Factory”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 8P065, pp. 2253-2255. |
|
R. Johnson, S. Smith, N. Kurita, K. Kishiyama, and J. Hinkson, “Calibration of the Beam-Position Monitor System for the SLAC PEP-II B Factory”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 9P083, pp. 2110-2112. |
|
K. Tian et al., “Commission of the Transverse Bunch-by-Bunch Feedback at SPEAR3”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 4081-4084. |