JaCoW Logo

Reference Search

Author: H. Kocevar


References



Reference
R. A. Baron et al., “ESS Beam Position and Phase Monitor System”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 543-547.
R. Miyamoto et al., “Beam Commissioning of Normal Conducting Part and Status of ESS Project”, in Proc. 31st Linear Accelerator Conf. (LINAC'22), Liverpool, UK, Aug.-Sep. 2022, pp. 18-24.
R. Miyamoto et al., “First Results of Beam Commissioning on the ESS Site for the Ion Source and Low Energy Beam Transport”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 1118-1121.
T. J. Shea et al., “Beam Instrumentation Performance During Commissioning of the ESS RFQ, MEBT and DTL”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 32-36.
T. J. Shea et al., “Overview and Status of Diagnostics for the ESS Project”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 8-15.
T. Shea et al., “Commissioning of ESS normal-conducting linac instrumentation and implications for future hadron linacs”, in Proc. 14th Int. Particle Accelerator Conf. (IPAC'23), Venice, Italy, May 2023, paper THPL091, pp. 4665-4668.
V. Grishin et al., “The First Experience and Results of Beam Diagnostics Deployment at the ESS Accelerator”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 2054-2057.
Y. Levinsen et al., “ESS Accelerator Lattice Design Studies and Automatic Synoptic Deployment”, in Proc. 13th International Computational Accelerator Physics Conference (ICAP'18), Key West, Florida, USA, Oct. 2018, pp. 285-289.


Back to the list