|
B. Bellesia et al., “Short Circuit Tests: First Step of LHC Hardware Commissioning Completion”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC103, pp. 304-306. |
|
K. Foraz et al., “Scheduling the Powering Tests”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPP010, pp. 2545-2547. |
|
S. Calatroni, E. Barbero-Soto, C. Benvenuti, L. Ferreira, and H. Neupert, “Progress Of Nb/Cu Technology with 1.5 GHz Cavities”, in Proc. 11th Workshop RF Superconductivity (SRF'03), Lübeck, Germany, Sep. 2003, paper WEO09, pp. 544-550. |
|
R. I. Saban et al., “The Commissioning of the LHC Technical Systems”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FROAC03, pp. 3801-3803. |
|
K. Foraz, E. Barbero-Soto, H. Gaillard, C. Hauviller, and S. Weisz, “Schedule evolution during the life-time of the LHC project”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPAN092, pp. 1592-1594. |
|
S. Weisz, E. Barbero-Soto, K. Foraz, and F. Rodriguez-Mateos, “Planning and Logistics Issues Raised by the Individual System Tests during the Installation of the LHC”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper THPCH185, pp. 3233-3235. |
|
C. Duchemin et al., “CERN-MEDICIS: A Unique Facility for the Production of Non-Conventional Radionuclides for the Medical Research”, in Proc. 11th Int. Particle Accelerator Conf. (IPAC'20), Caen, France, May 2020, pp. 75. |